Seaway7 East Anglia THREE - Final Monopile
Drone photography and social video of Seaway Ventus collecting the last monopile for the 1.4 GW East Anglia THREE offshore wind farm at BOW Terminal, Vlissingen.
Project Details:
Client: Seaway7
Location: BOW Terminal, Vlissingen (North Sea Port), Netherlands
Date: July 2026 - Final Monopile Load-Out
Services: Drone Operations, Photography, Film Production
Watch Video
GALLERY
The Project
East Anglia THREE is a 1.4 GW offshore wind farm off the Suffolk coast, developed by ScottishPower Renewables and Masdar. Seaway7 installed all 95 monopile foundations with its jack-up vessel Seaway Ventus, loading the foundations at BOW Terminal in Vlissingen and transporting them to the UK array site throughout the campaign.
In July 2026, Seaway Ventus collected the final monopile of the project. Portside Media documented the milestone for Seaway7's social media channels, capturing the scale of the operation from the air.
Scope:
Final monopile load-out at BOW Terminal, Vlissingen
Aerial documentation of Seaway Ventus and the monopile at the quayside
Social media video marking the end of the foundation campaign
Drone photography for project and corporate communications
The Challenge
A Milestone That Happens Once
The last monopile of a 95-foundation campaign doesn't get a second take. Timing was set by the vessel schedule, the lift plan and the weather, not by the film crew. Every key moment had to be captured as it happened.
Working Around Heavy-Lift Operations
Monopiles of up to 84 metres long and more than 1,000 tonnes are handled under strict safety procedures. Filming had to stay clear of lift operations and terminal traffic while still getting close enough to show the true scale of the foundation and the vessel.
North Sea Port Airspace
Vlissingen-Oost sits within North Sea Port's industrial zone, with restricted airspace in the surrounding area. Drone operations required:
Flying under an EASA Specific Category Operational Authorisation
Advance flight planning and airspace checks
Coordination with terminal and client HSE requirements
Real-time adjustment to vessel and crane movements
Deliverables
Visual Documentation:
Drone photography of the final monopile load-out at BOW Terminal
Aerial perspectives of Seaway Ventus with the monopile alongside the quay
Wide port context showing the terminal and the Westerschelde
Social Media Content:
Social media video marking the final monopile of East Anglia THREE
Edited for Seaway7's LinkedIn and social channels
Technical Coordination:
Flight planning within North Sea Port airspace
Scheduling around the vessel's load-out timeline
The Result
Seaway7 received drone photography and a social media video of the final monopile leaving Vlissingen for East Anglia THREE: content marking the completion of the foundation campaign on one of the UK's largest offshore wind projects.
The footage shows what makes these operations impressive: the scale of a 10-metre-diameter foundation, the jack-up vessel that carries it, and the port logistics behind every offshore wind installation.
Offshore wind, foundation load-outs, or vessel mobilizations?
From monopile load-outs to installation vessel mobilizations, Portside Media documents offshore wind logistics in Dutch and Belgian ports, working within live operations, restricted airspace and fixed vessel schedules.