Seaway7 East Anglia THREE - Final Monopile

Drone photography and social video of Seaway Ventus collecting the last monopile for the 1.4 GW East Anglia THREE offshore wind farm at BOW Terminal, Vlissingen.

Project Details:

Watch Video

GALLERY

The Project

East Anglia THREE is a 1.4 GW offshore wind farm off the Suffolk coast, developed by ScottishPower Renewables and Masdar. Seaway7 installed all 95 monopile foundations with its jack-up vessel Seaway Ventus, loading the foundations at BOW Terminal in Vlissingen and transporting them to the UK array site throughout the campaign.

In July 2026, Seaway Ventus collected the final monopile of the project. Portside Media documented the milestone for Seaway7's social media channels, capturing the scale of the operation from the air.

Scope:

  • Final monopile load-out at BOW Terminal, Vlissingen

  • Aerial documentation of Seaway Ventus and the monopile at the quayside

  • Social media video marking the end of the foundation campaign

  • Drone photography for project and corporate communications

The Challenge

A Milestone That Happens Once

The last monopile of a 95-foundation campaign doesn't get a second take. Timing was set by the vessel schedule, the lift plan and the weather, not by the film crew. Every key moment had to be captured as it happened.

Working Around Heavy-Lift Operations

Monopiles of up to 84 metres long and more than 1,000 tonnes are handled under strict safety procedures. Filming had to stay clear of lift operations and terminal traffic while still getting close enough to show the true scale of the foundation and the vessel.

North Sea Port Airspace

Vlissingen-Oost sits within North Sea Port's industrial zone, with restricted airspace in the surrounding area. Drone operations required:

  • Flying under an EASA Specific Category Operational Authorisation

  • Advance flight planning and airspace checks

  • Coordination with terminal and client HSE requirements

  • Real-time adjustment to vessel and crane movements

Deliverables

Visual Documentation:

  • Drone photography of the final monopile load-out at BOW Terminal

  • Aerial perspectives of Seaway Ventus with the monopile alongside the quay

  • Wide port context showing the terminal and the Westerschelde

Social Media Content:

  • Social media video marking the final monopile of East Anglia THREE

  • Edited for Seaway7's LinkedIn and social channels

Technical Coordination:

  • Flight planning within North Sea Port airspace

  • Scheduling around the vessel's load-out timeline

The Result

Seaway7 received drone photography and a social media video of the final monopile leaving Vlissingen for East Anglia THREE: content marking the completion of the foundation campaign on one of the UK's largest offshore wind projects.

The footage shows what makes these operations impressive: the scale of a 10-metre-diameter foundation, the jack-up vessel that carries it, and the port logistics behind every offshore wind installation.

Related Projects

Offshore wind, foundation load-outs, or vessel mobilizations?

From monopile load-outs to installation vessel mobilizations, Portside Media documents offshore wind logistics in Dutch and Belgian ports, working within live operations, restricted airspace and fixed vessel schedules.